Studio MA1 (Malterre-Barthes)
AR-401(ah) / 12 credits
Teacher: Malterre-Barthes Charlotte
Language: English
Withdrawal: It is not allowed to withdraw from this subject after the registration deadline.
Remark: Inscription faite par la section
Summary
This drawing based research studio examines construction as nested systems of material extraction, exploitation, cultural production, and value generation. It seeks to unpack, reveal, and communicate the complexity of actors and forces shaping contemporary space production.
Content
Keywords
Architecture, systems, political economy, construction, actors
Learning Outcomes
By the end of the course, the student must be able to:
- Map complex actor networks and capital flows in construction
- Analyze how invisible actors shape what gets built
- Identify intervention points within construction systems
- Conduct original research across various media
- Develop convincing final diagrams, drawings, renderings, simulations, physical and digital models.
- Deploy design skills toward systemic change
- Articulate strategies for representing complex-systems
- Think critically about architecture's role and complicity in extractive industries
- Develop abilities to work across scales: from material specifications to financial instruments to policy frameworks
Assessment methods
The grading will be based on consistent engagement and learning/unlearning curve of the students with each episode in the Studio. The grades will be proportionately distributed over the episodes listed as follows. The studio relies on self-assessment questionnaires to help with the grading.
-
Episode 01: 15%
Episode 02: 20 %
Episode 03: Phase 01 > 20 %
Episode 03: Phase 02 > 30 %
Reading Sessions & Overall Participation 15 %
Supervision
| Office hours | Yes |
| Assistant.e.s | Yes |
Resources
Virtual desktop infrastructure (VDI)
No
Bibliography
Ressources en bibliothèque
- L'Etang de Berre, interprétation d'un paysage métropolitain / Peraldi
- Find the other references related to the Berre case study at the Library
- La damnation de Fos / Paillard
- Construire avec la nature / François
- Mouvance : cinq mots pour le paysage / Berque
- Le territoire de l'Etang de Berre. In : A.M.C. n 82, sept 1997
In the programs
- Semester: Fall
- Exam form: During the semester (winter session)
- Subject examined: Studio MA1 (Malterre-Barthes)
- Courses: 2 Hour(s) per week x 14 weeks
- Project: 4 Hour(s) per week x 14 weeks
- Type: mandatory
- Semester: Fall
- Exam form: During the semester (winter session)
- Subject examined: Studio MA1 (Malterre-Barthes)
- Courses: 2 Hour(s) per week x 14 weeks
- Project: 4 Hour(s) per week x 14 weeks
- Type: mandatory
- Semester: Fall
- Exam form: During the semester (winter session)
- Subject examined: Studio MA1 (Malterre-Barthes)
- Courses: 2 Hour(s) per week x 14 weeks
- Project: 4 Hour(s) per week x 14 weeks
- Type: optional
Reference week
| Mo | Tu | We | Th | Fr | |
| 8-9 | |||||
| 9-10 | |||||
| 10-11 | |||||
| 11-12 | |||||
| 12-13 | |||||
| 13-14 | |||||
| 14-15 | |||||
| 15-16 | |||||
| 16-17 | |||||
| 17-18 | |||||
| 18-19 | |||||
| 19-20 | |||||
| 20-21 | |||||
| 21-22 |
Légendes:
Lecture
Exercise, TP
Project, Lab, other
Monday, 8h - 10h: Lecture
Monday, 10h - 12h: Project, labs, other
Monday, 13h - 18h: Project, labs, other
Tuesday, 8h - 12h: Project, labs, other
Tuesday, 15h - 18h: Project, labs, other